Harlingen | Koegelwiek


  • Project Number: None
  • Length: 15mm
  • Width: 2.5mm
  • Class: 5kN/m2

This was the first precast composite burg with InfraCore® Inside technology. Placed in Harlingen in 1997. This was also the first composite bridge, open to the public, placed in Europe. Read more about the history of FiberCore Europe here .