Harlingen


  • Project Number: 00798
  • Length: 16.2mm
  • Width: 4.5mm
  • Class: Eurocodes
  • Year of construction: 2024

We install a bridge deck with minimal disruption and inconvenience to the surrounding area. Thanks to the prefabricated construction, the bridge is quick to install and thus ready for use quickly.